返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 32 起落架 TB20飞机维护手册(84)

时间:2011-11-03 13:08来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
9) Check landing gear control linkage and indicating system - refer to 32-30-00.
10) Make sure that there is no leak or hydraulic fluid seepage.
11) Trace a reference mark with red paint on pipes (3) and (8).
12) Install the inspection door 238.
13) Install the rear bench seatpan - refer to 25-12-00.
14) Install the cowling under hull 218.
15) Lower the aircraft to ground and remove the jacks - refer to 07-10-00.
D. Removal of the landing gear relay NOTE : Simple operation, not described.
E. Installation of the landing gear relay NOTE 1 : Simple operation, not described.
Pre-MOD. 163
NOTE 2 : On receipt of relays (1) and (2) and of their mounting brackets, make sure they are correctly engaged. If not, put two drops of Loctite (TB 08-908) between relay and bracket.
All
NOTE 3 : The line on the diode shows the cathode. 3. ADJUSTMENT / TEST
None
ACAC
Validity : Electrohydraulic generator
"COMMERCIAL HYDRAULICS" 32-35-01Page 202
(DA) JUN 01
 
1 - UP relay (Pre-MOD. 163)
1A - UP relay (Post-MOD. 163)
2 - DOWN relay (Pre-MOD. 163) 2A - DOWN relay (Post-MOD. 163)
3 - Pipe
4 - Electrohydraulic generator
5 - Clamp
6 - Washer
7 - Bolt
8 - Pipe
9 - Union
10 - Union
 
Electrohydraulic generator - Removal / Installation
Figure 201
ACAC
Validity : Electrohydraulic generator "COMMERCIAL HYDRAULICS" 32-35-01Page 203
(DA) JUN 01
 
PAGE INTENTIONALLY LEFT BLANK
ACAC
Validity : Electrohydraulic generator
"COMMERCIAL HYDRAULICS" 32-35-01Page 204
(DA) JUN 01
 
4. INSPECTION / CHECK - ELECTROHYDRAULIC GENERATOR (Figure 202)
A. Tools and consumable materials
- 2 isolating valves
- 1 pressure gage
- 1 three-way union
- 3 high pressure pipes
- 1 battery 24 volts or constant voltage electric supply
- Electric wiring
- 1 ammeter
- 1 voltmeter
- 1 control switch
- Hydraulic fluid (TB 02-001)
B. Procedure
1) Remove the electrohydraulic generator - refer to Paragraph 2.
2) Connect the electrohydraulic generator according to Figure 202.
3) Open the two isolating valves and run motor in both directions to purge air from test system.
4) Close isolating valve (6). Run motor to check high pressure and electric consumption - refer to charts hereafter.
5) Run motor to the low pressure direction. The pressure has to reach zero.
6) Close isolating valve (8). Open isolating valve (6). Run motor to check low pressure and electric consumption - see charts hereafter.
7) Run motor to the high pressure direction. The pressure has to reach zero.
Pre-MOD. 124 or KIT OPT10 923000
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 32 起落架 TB20飞机维护手册(84)
 
------分隔线----------------------------