返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 32 起落架 TB20飞机维护手册(20)

时间:2011-11-03 13:08来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
NOTE : When lubricating the hollow pin, grease progressively with a lubricating gun. Do not work with big movements, in case of damaging the hollow pin by unswaging the pads.
ABAA
Validity : S / N 1 - 9999 32-10-00Page 210
(BA) JUN 01
 
  1 - Hollow pin
2 - Countersunk screw
3 - Nut
4 - Washer

14321000AAAVWZ14000
Main landing gear - Repair
Figure 204
 
PAGE INTENTIONALLY LEFT BLANK
ABAA
Validity : S / N 1 - 9999 32-10 Page 212
0 0 (BA) JUN 01
 
SHOCK-ABSORBER
MAINTENANCE PRACTICES
NOTE : This procedure is applicable to L.H. and R.H. installations. Information specific to R.H. installation are given in square brackets.
1. SERVICING
None
2. REMOVAL / INSTALLATION - SHOCK-ABSORBER (Figure 201)
A. Tools and consumable materials
- Grease (TB 04-004A)
- Cleaning agent (TB 11-003)
- Clean lintfree cloths
B. Removal of the shock-absorber
1) Jack up the aircraft - refer to 07-10-00.
WARNING : ENSURE THAT THE SHOCK-ABSORBER IS DEFLATED (ZERO PRESSURE) BEFORE PROCEEDING WITH MAINTENANCE PRACTICES.
2) Press on the valve mechanism to deflate the shock-absorber.
3) Remove and retain circlip (5).
4) Remove and retain bolt (6).
5) Remove and discard cotter pin (8), remove nut (7) and washer (9).
6) Hold shock-absorber (2) and remove bolt (10).
7) Clear shock-absorber (2) from gimbal joint (3) and landing gear.
8) Place shock-absorber (2) on a work bench.
C. Installation of the shock-absorber
1) Inspect the parts for correct condition, replace if necessary.
2) Clean the parts with clean lintfree cloths and cleaning agent (TB 11-003).
3) Lubricate bolts (6) and (10) with grease (TB 04-004A).
4) Position shock-absorber (2) on the landing gear, the sliding section upwards.
5) Attach the sliding section of shock-absorber (2) with bolt (10), washer (9) and nut (7). Torque - refer to 20-00-01. Lock with a new cotter pin (8).
6) Attach shock-absorber (2) to gimbal joint (3) with bolt (6) and circlip (5).
7) Inflate the shock-absorber - refer to 12-14-02.
8) Lower the aircraft to ground and remove the jacks - refer to 07-10-00.
9) Make sure all the tools and materials are removed and the work area is clean and free from debris.
WA
Validity : S / N 1 - 9999 32 10-02Page 201
(BA) JUN 01
 
Shock-absorber - Removal / Installation
Figure 201
WA
Validity : S / N 1 - 9999 32-10-02 (BA) Page
juN20012
 
MAINTENANCE PRACTICES
1. SERVICING
None
2. REMOVAL / INSTALLATION - MAIN LANDING GEAR DOOR (Figure 201)
A. Tools and consumable materials
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 32 起落架 TB20飞机维护手册(20)
 

------分隔线----------------------------