曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
7) Check landing gear control linkage and indicating system - refer to 32-30-00. 8) Make sure that there is no leak or seepage. 9) Mark nut position with red paint line. 10) Make sure all the tools and materials are removed and the work area is clean and free from debris. 11) Install the cowlings and / or inspection doors. 12) Lower the aircraft to ground and remove the jacks - refer to 07-10-00. 2. ADJUSTMENT / TEST - LANDING GEAR HYDRAULIC SYSTEM PIPES AND HOSES A. Tools and consumable materials - Hydraulic test bench 0 - 3627 psi (0 - 250 bars) B. Procedure 1) Connect pipe (hose) to the hydraulic test bench. 2) Apply pressure of 2466 psi (+ 435 ; - 0) [170 bars (+ 30 ; - 0)]. 3) Inspect for leaks and distortion. 4) Drop pressure. 5) Remove pipe (hose). AAAA Validity : S / N 1 - 9999 32 30 09Page 204 (BA) JUN 01 HYDRAULIC GENERATION DESCRIPTION AND OPERATION 1. GENERAL The hydraulic generation provides the pressurized hydraulic fluid which is required for the supply of the landing gear elements, used during the extension and retraction of the landing gear. The main elements of the hydraulic generation are : - the electrohydraulic generator, - the distribution plate, - the NORMAL / EMERGENCY valve. 2. LOCATION (Figure 1) COMPONENT QTY AREA ACCESS DOOR REFERENCE Electrohydraulic generator 1 230 218 / 238 32-35-01 Distribution plate 1 230 218 32-35-01 Landing gear emergency valve 1 250 / 32-35-02 Landing gear emergency control 1 250 / 32-35-03 3. DESCRIPTION |