返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 32 起落架 TB20飞机维护手册(52)

时间:2011-11-03 13:08来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
14) Check battery for charge, in particular if tests have not been done on ground power unit.
AAAA
Validity : S / N 1 - 9999 32-30 00Page 202
(BA) JUN 02
 
MAIN LANDING GEAR ACTUATING CYLINDER
MAINTENANCE PRACTICES
1. SERVICING
None
2. REMOVAL / INSTALLATION - MAIN LANDING GEAR ACTUATING CYLINDER (Figure 201)
A. Tools and consumable materials
- Torque wrench 0 - 250 Ibf.in (0 - 30 N.m)
I - Grease (TB 04-004A)
- Red paint  - Drip pan
- Hydraulic fluid (TB 02-001)
- Blanking plugs
B. Removal of the main landing gear actuating cylinder
1) Jack up the aircraft - refer to 07-10-00.
2) Make sure that the main switch-breaker is open.
3) Install the warning sign prohibiting main switch-breaker operation.
WARNING
DO NOT OPERATE
MAINTENANCE WORK IN PROGRESS
4) Make hydraulic pressure drop in the system by pulling landing gear emergency control.
5) Remove the cowling under hull 218.
6) Install a drip pan beneath cylinder.
7) Disconnect hoses (6) and (13) on fuselage side and blank off.
8) Remove nut (4), washer (3) and bolt (2). Discard nut (4).
9) Hold cylinder and remove nut (10), washer (11) and bolt (8) and discard nut (10).
10) Install cylinder on a work bench.
11) If required, disconnect hoses (6) and (13). Discard 0-rings (7) and (12). Blank off.
12) If required, service actuating cylinder - refer to C.M.M. (Component Maintenance Manual), Actuating cylinder, P/N TB20 47007.
AAAA
Validity : S / N 1 - 9999 32-30-01Page 201
(BA) JUN 02
 
C. Installation of the main landing gear actuating cylinder
1) Make sure, before installation, that the different parts have no wear or abnormal grooves, no friction, corrosion and buckling of the cylinder rod. Check hoses for condition. Replace if necessary.
2) Check actuating cylinder (5) length and min. gap of 0.12 in (3 mm) - refer to Figure 202, adjust if necessary - refer to Paragraph 3.
3) Lubricate hinges with grease (TB 04-004A).
4) If disconnected, connect hoses (6) and (13) equipped with new 0-rings (7) and (12) to the actuating cylinder - refer to 20-00-02. Torque - refer to 20-00-01.
5) Attach actuating cylinder (5) to attachment fitting (9) with bolt (8), washer (11) and new nut (10).
6) Attach actuating cylinder (5) rod to hinged strut (1) with bolt (2), washer (3) and new nut (4).
7) Connect hoses (6) and (13) to unions on fuselage side - refer to 20-00-02.
8) Push back the landing gear emergency control.
9) Add fluid in the electrohydraulic generator reservoir - refer to 12-13-03.
10) Check landing gear control linkage and indicating system - refer to 32-30-00.
11) Make sure there is no leak or seapage at the level of unions, hoses and cylinder rod.
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 32 起落架 TB20飞机维护手册(52)
 
------分隔线----------------------------