返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 32 起落架 TB20飞机维护手册(19)

时间:2011-11-03 13:08来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
Key to Figure 202
ABAA
Validity : S / N 1 - 9999 32 10 00 Page 206
(BA) JUN 01
 

 
10) Connect the microswitch (21) connectors and attach the electrical wiring to the landing gear.
11) Install grease nipples (8) and (13). Torque - refer to 20-00-01.
12) Lubricate the landing gear leg completely - refer to 12-21-05.
13) Install the brake unit - refer to 32-42-02.
14) Install the main wheel - refer to 32-41-01.
15) Install the landing gear - refer to Paragraph C.
3. ADJUSTMENT / TEST
None
4. INSPECTION / CHECK - MAIN LANDING GEAR (Figure 203)
A. Tools and consumable materials
- Adhesive
- Plumb line
- Reglet
B. Check of the main landing gear clearance
1) Level the aircraft - refer to 08-10-00.
2) Put a large adhesive strip under the main landing gears, vertically to the wheel axle.
3) With a plumb line, perform the following operations
a) By pushing sidewise on the landing gear, mark "A" and "B" points.
b) By pushing the landing gear forward and backward, mark "C" and "D" points.
4) Measure the distance between "A" and "B" points and then "C" and "D" points. Both dimensions must be lower than 0.20 in (5 mm).
NOTE : It is recommended to replace the hinge bearing gimbals of the main landing gears when the dimension measured is equal or upper than 0.20 in (5 mm).
5. CLEANING / PAINTING
None
ABAA
Validity : S / N 1 - 9999
Page 208
32-10-00
(BA) SEP 04
 
Main landing gear - Inspection / Check
Figure 203
ABAA
Validity : S / N 1 - 9999 32-10-00Page 209
(BA) SEP 04
 
6. REPAIR - MAIN LANDING GEAR (Figure 204)
A. Tools and consumable materials
- Standard aeronautical maintenance station tools.
B. Repair of hollow pin
1) Materials required
- a countersunk screw - P / N Z00.N5156294236 (2)
- a washer - P / N Z00.N5701039240 (4)
- a nut - P / N Z00.N5401458239 (3)
2) Procedure
Repair consists in positioning again one or both pads (uncrimped when a too hard pressure is applied by the grease pump during hollow pin lubrication) and in maintaining these pads with a bolt :
a) Remove one pad.
b) Degrease hollow pin and pads.
c) Drill in the middle of both pads a dia. .20 in (5.1 mm) hole.
d) Countersink hole of one pad at 120°.
e) Deburr pads, clean them as well as hollow pin.
f) Position again pads on hollow pin.
CAUTION : TIGHTENING LIMIT : POSITION BOLT AGAINST PADS AND SCREW NUT OF ONLY 1/2 ADDITIONAL TURN.
g) After assembly on the landing gear, do not forget to lubricate the hollow pin.
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 32 起落架 TB20飞机维护手册(19)
 

------分隔线----------------------------