曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
1) Jack up the aircraft - refer to 07-10-00. 2) Make sure that the main switch-breaker is open. 3) Install the warning sign prohibiting main switch-breaker operation. WARNING DO NOT OPERATE MAINTENANCE WORK IN PROGRESS 4) Remove the engine cowlings (nose landing gear microswitch) - refer to 71-10-01. 5) If installed, connect the ground power unit - refer to 24-40-00. 6) Close main switch-breaker. WARNING : PRIOR TO ANY LANDING GEAR OPERATION, MAKE SURE THE LANDING GEAR AREA IS CLEAR. 7) Retract landing gears. 8) Check that lights are "OFF" on control panel. 9) Check that the microswitch is in full contact (after the click) with the nose landing gear leg and with the main landing gear shock-absorbers. AAAA Validity : S / N 1 - 9999 Page 205 32-30-07 (BA) JUN 02 S / N 1 - 790 10) Check that the Service Letter No. 26 has been applied. S / N 1 - 9999 11) Check landing gear control linkage and indicating system - refer to 32-30-00. 12) If connected, disconnect the ground power unit - refer to 24-40-00. 13) Lower the aircraft to ground and remove the jacks - refer to 07-10-00. 14) Install the engine cowlings - refer to 71-10-01. 15) Remove the warning sign prohibiting main switch-breaker operation. WA Validity S / N 1 - 9999 32-30-07Page 206 (BA) JUN 02 1 - Connector 2 - Bolt 3 - Washer 4 - Bracket 5 - Microswitch 6 - Counterplate 6A - Counterplate 7 - Washer 8 - Nut |