曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
9) Position bearing (40) on sliding cylinder (45). Do not rotate. 10) Lubricate new 0-rings (33) and (35) with lubricant (TB 04-903). ABAB Validity : Nose landing gear equipped with thrust-bearing needle cage 32-20 00Page 405 (BA) JUN 01 23 - Landing gear leg 31 - Shouldered bushing 32 - Retaining ring 33 - 0-ring 34 - Plug 35 - 0-ring 36 - Hinged body 37 - Counterplate 38 - Needle stop 39 - Cage 40 - Bearing 41 - Anti-extrusion ring 42 - 0-ring 43 - Scraper ring 44 - Circlip 45 - Sliding cylinder 46 - Stop 47 - Scissors 54 - Segment Nose landing gear - Disassembly / Assembly Key to Figure 403 ABAB Validity : Nose landing gear equipped with thrust-bearing needle cage 32 20-00Page 406 (BA) JUN 01 Nose landing gear - Disassembly / Assembly Figure 403 ABAB 11) Fit 0-ring (35) onto bearing (40). 12) Position 0-ring (33) on plug (34). 13) Install plug (34) on sliding cylinder (45), position retaining ring (32) and lock by rotating ring clockwise. 14) Degrease landing gear leg (23), valve (26) and restrictor (48) with cleaning agent (TB 11-913). 15) Lubricate new 0-ring (27) with hydraulic fluid (TB 02-001). 16) Fit restrictor (48) with valve (26), circlip (25) and 0-ring (27). 17) Insert and secure restrictor (48) assembly into landing gear leg (23) with seal washers (29) and bolts (28). Mark bolts with a dash of red paint. 18) Smear segments (54), cage (39), shouldered bushing (31), needle stop (38) and counterplate (37) with lubricant (TB 04-004A). 19) Insert counterplate (37), needle stop (38), then hinged body (36) fitted with cage (39) and shouldered bushing (31) into landing gear leg (23). 20) Insert and secure upper stop (30) into landing gear leg (23) using bolt (24), washer (50) and a new nut (49). 21) Attach lever (51) to landing gear leg (23) using bolts (53) and washers (52). 22) Apply an even thick coat of protection product (TB 05-917) onto bearing (40) up to 0-ring (35) with a flat paint brush. 23) Insert sliding cylinder (45) / bearing (40) assembly into landing gear leg (23). 24) Remove excess protection product (TB 05-917) scraped off by landing gear leg (23). 25) Install circlip (44) into landing gear leg (23) groove. 26) Rotate landing gear leg (23) several times to make sure circlip (44) positioning is correct. 27) Clean sliding cylinder (45). Lubricate it with hydraulic fluid (TB 02-001). 28) Use Loctite (TB 09-906) to install charging valve (21) with new 0-ring (22). Allow to harden for 1 to 2 hours. 29) Install upper scissors (47) on boss of landing gear leg (23) - refer to 32-20-03. 30) Lubricate hinged body (36) and scissors with lubricant (TB 04-004A) - refer to 12-21-05. 中国通航网 www.ga.cn 通航翻译 www.aviation.cn 本文链接地址:TB20 MAINTENANCE MANUAL 32 起落架 TB20飞机维护手册(30) |