返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 34 导航 TB20飞机维护手册 1(12)

时间:2011-11-09 15:56来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
1. SERVICING 201
2. REMOVAL / INSTALLATION -
RADIONAVIGATION INSTRUMENTS 201
A. Tools and consumable materials 201
B. Typical removal procedure of a radionavigation
instrument 201
C. Typical installation procedure of a radionavigation
instrument 201
 
SOCATA
TB 20 MODEL  MAINTENANCE MANUAL
SUBJECT CHAPTER PAGE VALIDITY
NAV 1 INSTALLATION 34-51-00 (BI) 1 KNS 81
DESCRIPTION AND OPERATION  1 
1. GENERAL  1 
2. LOCATION  3 
3. OPERATION  3 
NAV 1 INSTALLATION 34-51-00 (BQ) 1 KNS 80
DESCRIPTION AND OPERATION  1 
1. GENERAL  1 
2. LOCATION  3 
3. OPERATION  3 
NAV 1 INSTALLATION 34-51-00 (CU) 1 KX 165 without EFIS
DESCRIPTION AND OPERATION  1 
1. GENERAL  1 
2. LOCATION  4 
3. OPERATION  4 
NAV 1 INSTALLATION 34-51-00 (DA) 1 KX 155 without audio
DESCRIPTION AND OPERATION  1 control box
1. GENERAL  1 
2. LOCATION  1 
3. OPERATION  1 
NAV 1 INSTALLATION 34-51-00 (DE) 1 KX 155 - KX 155A
DESCRIPTION AND OPERATION  1 with audio control box
1. GENERAL  1 
2. LOCATION  2 
3. DESCRIPTION  2 
A. A51 VHF NAV/COMM. transceiver  2 
B. E33 VOR/LOC antenna  6 
C. E34 GS antenna  6 
D. A59 VOR signal separator (option)  6 
E. A60 GS signal separator (option)  6 
F. Course deviation indicator (option)  6 
G. A95 VOR/LOC converter (option)  8 
4. OPERATION  8 
A. VOR/LOC mode  8 
B. Glide slope mode (option)  8 
NAV 1 INSTALLATION 34-51-00 (DI) 1 GNS 430
DESCRIPTION AND OPERATION  1 
1. GENERAL  1 
2. LOCATION  2 

ADAA
Validity : S / N 1 - 9999 34-TC (EA) Page 9 JUN 04
 
NAV 1 INSTALLATION (Continued) 34-51-00 (DI)
3. DESCRIPTION 2
A. A78 COMM./VOR-ILS/GPS transceiver 2
B. E33 VOR/LOC antenna 5
C. E34 GS antenna 5
D. A59 VOR signal separator (option) 5
E. A60 GS signal separator (option) 5
F. M81 course deviation indicator 5
4. OPERATION 8
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 34 导航 TB20飞机维护手册 1(12)
 

------分隔线----------------------------