返回首页
当前位置: 主页 > 通航资料 > 钻石 >

钻石42飞机飞行手册 DA 42 Airplane Flight Manual(117)

时间:2011-10-28 13:17来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  


Intentionally left blank.


CHAPTER 8
AIRPLANE HANDLING, CARE AND MAINTENANCE

Page
8.1 INTRODUCTION ........................................ 2

8.2 AIRPLANE INSPECTION INTERVALS ....................... 2

8.3 AIRPLANE ALTERATIONS OR REPAIRS ..................... 3

8.4 SERVICING ............................................ 3

8.4.1  REFUELING ....................................... 3

8.4.2 ENGINE OIL LEVEL CHECK .......................... 4

8.4.3 GEARBOX OIL LEVEL CHECK ........................ 4

8.4.4  TIRE INFLATION PRESSURE CHECK .................. 5

8.5 GROUND HANDLING / ROAD TRANSPORT .................. 6

8.5.1 GROUND HANDLING ............................... 6

8.5.2  PARKING ......................................... 7

8.5.3  MOORING ........................................ 9

8.5.4  JACKING ......................................... 9

8.6 CLEANING AND CARE .................................. 10

8.6.1  PAINTED SURFACES .............................. 10

8.6.2  CANOPY AND REAR DOOR ......................... 11

8.6.3  PROPELLER ..................................... 11

8.6.4  ENGINE ......................................... 11

8.6.5  INTERIOR SURFACES ............................. 11

8.7 GROUND DE-ICING..................................... 12

Doc. No. 7.01.05-E  Rev. 5  15-Nov-2007  Page 8 - 1 


8.1 INTRODUCTION
Chapter 8 contains the manufacturer's recommended procedures for proper ground handling and servicing of the airplane. The Airplane Maintenance Manual (Doc. No. 7.02.01) lists certain inspection and maintenance requirements which must be followed if the airplane is to retain a new plane performance and reliability.
8.2 AIRPLANE INSPECTION INTERVALS
Inspections are scheduled every 100, 200, 1000 and 2000 hours. Independent of the flight hours an annual inspection must be performed every year. A non-recurring engine inspection must be performed on new engines after 3 to 6 hours. The respective inspection checklists are prescribed in the Airplane Maintenance Manual, Chapter 05.
For maintenance work on engine and propeller, the currently effective Operator's Manuals, Service Instructions, Service Letters and Service Bulletins of TAE and mt-Propeller must be followed. For airframe inspections, the currently effective checklists/manuals, Service Bulletins and Service Instructions of the manufacturer must be followed.
CAUTION
Unscheduled maintenance checks are required after:
-hard landings -propeller strike -engine fire -lightning strike -occurrence of other malfunctions and damage
Unscheduled maintenance checks are described in the Airplane Maintenance Manual (Doc. No. 7.02.01; Section 05-50).
Page 8 - 2  Rev. 5  15-Nov-2007  Doc. No. 7.01.05-E 
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:钻石42飞机飞行手册 DA 42 Airplane Flight Manual(117)
 

------分隔线----------------------------