曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
406 SEP 04
ADAA
Validity : S / N 1 - 9999 53 LEP (EA) Page 2 SEP 04
TABLE OF CONTENTS
SUBJECT CHAPTER
FUSELAGE 53-00-00 (BA)
DESCRIPTION AND OPERATION PAGE
1
1 VALIDITY
1 - 9999
1. GENERAL 1
2. LOCATION 1
3. DESCRIPTION 1
A. Forward fuselage structure 1
B. Rear fuselage structure 1
C. Upper fuselage panel structure 1
D. Footstep 1
E. Access door mechanism 1
FUSELAGE 53-00-00 (BA) 601 1 - 9999
INSPECTION / CHECK 601
1. INSPECTION / CHECK - FUSELAGE 601
A. Tools and consumable materials 601
B. Procedure 601
FORWARD FUSELAGE STRUCTURE 53-10-00 (EA) 1 1 - 9999
DESCRIPTION AND OPERATION 1
1. GENERAL 1
2. LOCATION 1
3. DESCRIPTION 1
A. Frames and fittings 1
FRAMES AND FITTINGS 53-10-01 (CA) 401 1 - 9999
REMOVAL / INSTALLATION 401
1. REMOVAL OF THE WING REAR ATTACHMENT 401
A. Tools and consumable materials 401
B. Procedure 401
2. INSTALLATION OF THE WING REAR ATTACHMENT 401
A. Tools and consumable materials 401
B. Procedure 401
FRAMES AND FITTINGS 53-10-01 (CA) 501 1 - 9999
ADJUSTMENT / TEST 501
1. ADJUSTMENT OF THE WING REAR ATTACHMENT 501
A. Tools and consumable materials 501
B. Procedure 501
ADAA
Validity : S / N 1 - 9999 Page 1
53-TC (EA) SEP 04
SOCATA
TB 20 MODEL
SUBJECT CHAPTER MAINTENANCE MANUAL
PAGE VALIDITY
FRAMES AND FITTINGS 53-10-01 (BA) 801 1 - 433
REPAIR 801
• 1. REINFORCEMENT OF FRAME C4 801
A. Tools and consumable materials 801
B. Procedure 802
REAR FUSELAGE STRUCTURE 53-20-00 (BA) 1 1 - 9999
DESCRIPTION AND OPERATION 1
1. GENERAL 1
2. LOCATION 1
3. DESCRIPTION 1
A. Frames 1
B. Skins 1
C. Fairings 1
1 D. Fittings 1
FRAMES 53-20-01 (BA) 801 1 - 450
REPAIR 801
REPLACEMENT OF THE FLIGHT CONTROL REAR
11.
SUPPORT ON FRAME C9 801
A. Tools and consumable materials 801
1 B. Procedure 802
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 53 机身 TB20飞机维护手册(2)
|