曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
S / N 796 - 9999 and S / N 1 - 795 Post-Kit OPT10 914500 - refer to Detail A 4) Remove bolts (1) and washers (2) S / N 1 - 9999 5) Remove bracket assembly (6) [3]. 6) Remove the sealant with a spatula and clean the surfaces with a lintfree clean cloth moistened with cleaning agent (TB 11-003). 2. INSTALLATION OF BRACKET ASSEMBLY (Figure 401) A. Tools and consumable materials - Red paint - Torque wrench 0 - 177 lbf.in (0 - 20 N.m) Sealant (TB 09-916) - Petrolatum (TB 04-012) - Cleaning agent (TB 11-003) - Lintfree clean cloth WA Validity : S / N 1 —9999 53-20-05Page 401 (BA) SEP 04 B. Procedure 1) Apply a very thin layer of petrolatum (TB 04-012) to the bearing face of bracket assembly (6) [3]. S / N 1 - 795 Pre-Kit OPT10 914500 - refer to Detail B 2) Apply some sealant (TB 09-916) to the bearing face of bracket assembly (6) [3] and bolts (1) and (7) -refer to 20-00-09. 3) Position bracket assembly (6) [3] on frame C9 and secure with bolts (1) and (7), washers (2) and (4) and new nuts (5). 4) Torque according to "Specific cases" tightening procedure - refer to 20-00-01. S / N 796 - 9999 and S / N 1 - 795 Post-Kit OPT10 914500 - refer to Detail A 2) Apply some sealant (TB 09-916) to the bearing face of bracket assembly (6) [3] and bolts (1) - refer to 20-00-09. 3) Position the bracket assembly (6) [3] on frame C9 and secure with bolts (1), washers (2) and (4) and new nuts (5). 4) Torque according to "Specific cases" tightening procedure - refer to 20-00-01. S / N 1 - 9999 5) Wipe off excess sealant with a lintfree clean cloth moistened with cleaning agent (TB 11-003). 6) Mark nuts (5) with a red paint line. 7) Make sure all the tools and materials are removed and the work area is clean and free from debris. 8) Install the elevator - refer to 55-20-01. 9) Install the tail cone - refer to 53-20-04. WA Validity : S / N 1 - 9999 53-20-05 (BA) Page 402 SEP 04 Fittings - Removal / Installation Figure 401 PAGE INTENTIONALLY LEFT BLANK AAAA Validity : S / N 1 - 9999 Page 404 53-20-05 (BA) SEP 04 UPPER FUSELAGE PANEL STRUCTURE DESCRIPTION AND OPERATION 1. GENERAL I Aerodynamic fairing is ensured by an upper fuselage panel. The upper fuselage panel structure consists of : - the front part, - the central part, - the rear part. 2. LOCATION (Figure 1) COMPONENT QTY AREA ACCESS DOOR REFERENCE |