返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 27 FLIGHT CONTROLS TB20飞机维护手册 飞行操纵(44)

时间:2011-11-01 13:12来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
2) Reinstall rear reel (54) equipped with rear cable (39) on actuator.
a) Inspect the various components of the actuator for condition ; replace any defective parts. Actuators without shims - see Figure 403, Detail B
b) If removed, install yoke (55) on support (59).
- Lubricate yoke (55) and bolts (62) with grease (TB 04-004A).
- Install yoke (55) on support (59) with bolts (62) by interposing a washer (61) on each side - see Detail B.
- Center yoke (55) with spacers (60) ; install washers (61), nuts (53) and safety with two new cotter pins (63).
c) Position rear reel (54) generously lubricated with grease (TB 04-004A) in its housing, cable "L.H. threaded" end fitting directed forward on the L.H. side.
Actuators with shims - see Figure 403A, Detail B
b) If removed, install yoke (55) on support (59).
- Lubricate yoke (55) and bolts (62) and (67) with grease (TB 04-004A).
- Install yoke (55) on support (59) with bolts (62) and a washer (61) on each side - see Detail B.
- Center yoke (55) with spacers (60) ; install washers (61), nuts (53) and safety with two new cotter pins (63).
c) Position upper actuator bearing (68) onto yoke (55) while interposing shim (65) (if installed) and screw bolts (67) equipped with new lockwashers (66) over a few threads.
d) Position rear reel (54) generously lubricated with grease (TB 04-004A) in its housing, cable "L.H. threaded" end fitting directed forward on the L.H. side.
e) Screw bolts (67) of upper actuator bearing (68) until contact is achieved. Center rear reel (54) and install shim (65) (if installed) and the second actuator bearing (68) with bolts (67) equipped with new lockwashers (66).
f) Check the 0.004 in (0.1 mm) clearance - see Figure 403A, Detail B. Readjust if necessary.
g) Lock bolts (67) with lockwashers (66).
Actuators Post-MOD. 148 - see Figure 403B, Detail B
b) If removed, install yoke (55) on support (59).
- Lubricate yoke (55), new seals (69) and bolts (62) and (67) with grease TB 04-004A.
- Install yoke (55) on support (59) with bolts (62) and a washer (61) on each side - see Detail B.
- Center yoke (55) with spacers (60) ; install washers (61), nuts (53) and lock with two new cotter pins (63).
c) Position upper actuator bearing (68) onto yoke (55) while interposing shim (65) (if installed) and screw bolts (67) equipped with new lockwashers (66) over some threads.
d) Position rear reel (54) generously lubricated with grease (TB 04-004A) in its housing, cable "L.H. threaded" end fitting directed forward on the L.H. side.
ACAC
Validity : S / N 1 - 9999 27-30 03 (cA) P asgEep40026
 
e) Screw bolts (67) of upper actuator bearing (68) until contact is achieved. Center rear reel (54) and install shim (65) (if installed) and the second actuator bearing (68) with bolts (67) equipped with new lockwashers (66).
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 27 FLIGHT CONTROLS TB20飞机维护手册 飞行操纵(44)
 
------分隔线----------------------------