返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 61 螺旋桨 TB20飞机维护手册(23)

时间:2011-11-11 10:06来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
 

 
PAGE INTENTIONALLY LEFT BLANK
ADAA
Validity : S / N 1 - 9999 61 20-01Page 504
(EA) JUN 02
 
PROPELLER GOVERNOR CONTROL
REMOVAL / INSTALLATION
1. REMOVAL OF THE PROPELLER GOVERNOR CONTROL (Figure 401)
A. Tools and consumable materials
- None
B. Procedure
WARNING : PRIOR TO ANY OPERATION, ENSURE THAT THE ENGINE, EXHAUST PIPE AND MANIFOLDS ARE COLD. IF NOT, TAKE NECESSARY PRECAUTIONS TO AVOID SEVERE BURNS.
WARNING : PRIOR TO ANY OPERATION, ENSURE THAT THE KEY IS REMOVED FROM MAGNETO SELECTOR AND THAT "MAIN SWITCH" IS OFF.
IF AIRCRAFT IS EQUIPPED WITH DISCONNECT PLUG ON FIREWALL, DISCONNECT "MAGNETO DISCONNECT" PLUG AND CONNECT IT TO "GROUND MAGNETO FOR SERVICING" PLUG.
1) Remove the engine cowlings - refer to 71-10-01.
2) Remove the control pedestal - refer to 25-14-00.
3) Remove and discard cotter pin (5), retain washer (4) and clevis pin (3). Then disengage fork end (2) from control lever (1).
4) Remove fork end (2) and jam nut (6).
5) Remove nut (8) and discard lockwasher (9).
6) Remove and discard nut (34), remove washers (30), (32) and (33) and bolt (31).
7) Remove swivel rod end (26), jam nut (28) or protective sleeve (25).
8) Cut off and discard lockwire and remove nut (24).
9) Remove inspection door 235R to gain access to clamp (16) - refer to 06-30-00.
10) Remove and discard nut (13), remove washer (14), bolt (15) and clamp (16).
11) Remove inspection door 211 L to gain access to clamp (17) - refer to 06-30-00.
12) Remove and discard blind rivet (18) — refer to 51-40-02, retain washer (19) and clamp (17). NOTE : Set control wheels to nose down attitude.
13) Remove sealant (21) from grommet (20).
14) Mark control (7) routing then cut off and discard the tie-wraps that attach it.
15) Disengage control (7) from pedestal bulkhead (10) to remove nut (12) and lockwasher (11). Discard lockwasher (11).
16) Remove control (7).
 
2. INSTALLATION OF THE PROPELLER GOVERNOR CONTROL (Figure 401)
A. Tools and consumable materials
- Sealant (TB 09-904)
- Oil (TB 03-900)
- Grease (TB 04-004A)
- Stainless steel lockwire, dia. 0.032 in (0.8 mm)
- Tie-wraps
- Protection tape (TB 05-938)
B. Procedure
WARNING : PRIOR TO ANY OPERATION, ENSURE THAT THE ENGINE, EXHAUST PIPE AND MANIFOLDS ARE COLD. IF NOT, TAKE NECESSARY PRECAUTIONS TO AVOID SEVERE BURNS.
WARNING : PRIOR TO ANY OPERATION, ENSURE THAT THE KEY IS REMOVED FROM MAGNETO SELECTOR AND THAT "MAIN SWITCH" IS OFF.
IF AIRCRAFT IS EQUIPPED WITH DISCONNECT PLUG ON FIREWALL, DISCONNECT "MAGNETO DISCONNECT" PLUG AND CONNECT IT TO "GROUND MAGNETO FOR SERVICING" PLUG.
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 61 螺旋桨 TB20飞机维护手册(23)
 

------分隔线----------------------------