曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
a) Attach engine side bulkhead (6) with bolts (5), spacers (11), washers (10) and new nuts (9). b) Torque - refer to 20-00-01. c) Mark nuts (9) position with a red paint line. 4) Remove the blanking caps and install a new 0-ring (8). AHAH Validity : Not de-iced three-blade propeller 61-10-00Page 401 (FA) SEP 04 5) Position propeller (4) on the engine and align the "0" of the propeller with the "0" of brush ring (7). Attach the propeller with bolts (13) equipped with nuts (12). 6) Torque bolts (13) according to "Specific cases" tightening procedure - refer to 20-00-01. 7) Lockwire. 8) Mark nut position with a red paint line. 9) Check adhesive tapes (15) for condition on cylinder side bulkhead (1). 10) Position and attach spinner (14) with screws (3) and washers (2). NOTE : If spinner (14), inside, and engine side bulkhead (6), on its front part, are marked with a red paint line, align these lines during installation. NOTE : If slack appears at cylinder side bulkhead (1), add adhesive tape (15) - refer to Illustrated Parts Catalog. 11) Install the engine cowlings - refer to 71-10-01. 12) Perform a test run-up - refer to 05-30-02. 13) After the run-up, check for traces of leaks (oil) around propeller attachment. 14) Perform a test flight - refer to 05-30-00. 1 - Cylinder side bulkhead 2 - Washer 3 - Screw 4 - Propeller 5 - Bolt 6 - Engine side bulkhead 7 - Brush ring 8 - 0-ring 9 - Nut 10 - Washer 11 - Spacer 12 - Nut 13 - Bolt 14 - Spinner 15 - Adhesive tape |