返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 35 氧气 TB20飞机维护手册(16)

时间:2011-11-10 10:44来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
4) Remove previous white paint marks.
CAUTION : DO NOT LUBRICATE UNIONS.
5) On unions, wind 1 turn to 1 turn and 1/2 of teflon tape (TB 09-901) from the second thread.
6) Position pipe on union and torque - refer to 20-00-02.
7) Perform a leak test of the oxygen system - refer to 35-00-00.
8) Mark position of pipe unions and nuts with a white paint line.
9) Perform an operational test of the oxygen system - refer to 35-00-00.
 
PAGE INTENTIONALLY LEFT BLANK
WA
Validity : S / N 1 - 9999 35 00 01 (BA)Paj UN 04
ge 302

 


 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 35 氧气 TB20飞机维护手册(16)
 
------分隔线----------------------------