返回首页
当前位置: 主页 > 通航资料 > 钻石 >

钻石20系列飞机维护手册 DA 20 SERIES AIRPLANE MAINTENANCE MANUAL(27)

时间:2011-10-28 13:51来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  

(c)
Turn up speaker volume on

 


audio panel. check, if available use different one  (headset)
Problem cannot be resolved: switch transponder (if available) to "COMM FAILURE"  code if required by the situation and permitted by   applicable national regulations.


3.3.12. Trim System Failure
STUCK TRIM:
1.
Circuit breaker  check, press if breaker is tripped

2.  
Rocker switch depress in both directions, wait  5 minutes, try again


NOTE

Full range of travel is available for elevator, but expect higher forces on control stick.
3. Land at the nearest suitable airport
RUNAWAY OF TRIM:

1.  
Control Stick Grip stick and maintain control of   the airplane.

2.
Trim motor circuit breaker  Pull circuit breaker.

3.
Rocker Switch  Check if depressed.


If reason for runaway condition is obvious and has been resolved, push in (engage) circuit breaker.
NOTE

Full travel of the elevator trim system will take approximately 10 seconds.

3.3.13. Instrument Panel Lighting Failure
1.
Rocker Switch, map light ON

2.
Rocker Switch, I-panel lighting Cycle Rocker Switch OFF - ON

3.
Dimming Control Turn fully clockwise

4.
Internal Lighting Circuit Breaker If tripped, reset

5.
If NOT Successful Use flashlight


Expect electrical power failure. Refer to paragraph 3.3.8.

CHAPTER 4

NORMAL OPERATING PROCEDURES

4.1. INTRODUCTION...............................................................................................................2


4.2. AIRSPEEDS FOR NORMAL FLIGHT OPERATION.........................................................2


4.3. STRUCTURAL TEMPERATURE INDICATOR.................................................................3


4.4. NORMAL OPERATION CHECKLIST ...............................................................................5


4.4.1. Preflight Inspection......................................................................................................5


4.4.2. Before Starting Engine................................................................................................9


4.4.3. Starting Engine..........................................................................................................10


4.4.4. Before Taxiing...........................................................................................................13


4.4.5. Taxiing.......................................................................................................................13


4.4.6. Before Take-off (Engine Run-up)..............................................................................14
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:钻石20系列飞机维护手册 DA 20 SERIES AIRPLANE MAINTENANCE MANUAL(27)
 

------分隔线----------------------------