返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 31 指示/记录系统 TB20飞机维护手册(21)

时间:2011-11-03 12:07来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
6) Install and secure upholstery panel (9) with screws (7) and (12) and washers (6) and (11).
7) Install and secure instrument panel cover (5) with clips (2) and install the lighting rheostat knobs.
8) Close main switch-breaker.
9) Perform a test of the advisory panel with the "TEST" pushbutton.
10) Open main switch-breaker.
ACAD
Validity : S / N 823 - 849,888,948 - 9999
31 50 01Page 401
(EA) SEP 02
 
  1 - Instrument panel
2 - Clip
3 - Bolt
4 - Warning light
5 - Instrument panel cover
6 - Washer
7 - Screw
8 - Electrical connector
9 - Upholstery panel
10 - Support
11 - Washer
12 - Screw

 
 

 
Advisory panel - Removal / Installation
Figure 401
ACAD
Validity : S / N 823 - 849, 888, 948 - 9999 31 50 01Page 402
(EA) SEP 02

 


 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 31 指示/记录系统 TB20飞机维护手册(21)
 
------分隔线----------------------------