返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 31 指示/记录系统 TB20飞机维护手册(2)

时间:2011-11-03 12:07来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
REMOVAL / INSTALLATION  401 
1. REMOVAL OF CENTRAL CONSOLE  401 
A. Tools and consumable materials  401 
B. Procedure  401 
2. INSTALLATION OF CENTRAL CONSOLE  402 
A. Tools and consumable materials  402 
B. Procedure  402 
CENTRAL CONSOLE 31-10-02 (DA) 401 Post-MOD. 151
REMOVAL / INSTALLATION  401 
1. REMOVAL OF CENTRAL CONSOLE  401 
A. Tools and consumable materials  401 
B. Procedure  401 
2. INSTALLATION OF CENTRAL CONSOLE  402 
A. Tools and consumable materials  402 
B. Procedure  402 

ADM
Validity : S / N 1 - 9999 31 -TC (EA) Page 1 SEP 02
 
SOCATA
TB 20 MODEL
SUBJECT CHAPTER MAINTENANCE MANUAL
PAGE VALIDITY
ENGINE MONITORING CLUSTER 31-10-03 (BA) 401 1 - 9999
REMOVAL / INSTALLATION  401 
1. REMOVAL OF THE ENGINE MONITORING CLUSTER 401 
A. Tools and consumable materials  401 
B. Procedure  401 
2. INSTALLATION OF THE ENGINE MONITORING   
CLUSTER  401 
A. Tools and consumable materials  401 
B. Procedure  401 
ENGINE MONITORING CLUSTER 31-10-03 (DA) 501 1 - 524, Pre-Kit
ADJUSTMENT / TEST  501 OPT10 911400 (MOD. 46)
1. ADJUSTMENT OF ENGINE MONITORING   
CLUSTER  501 
A. Tools and consumable materials  501 
B. Procedure  503 
ENGINE MONITORING CLUSTER 31-10-03 (DG) 501 823 - 849,
I ADJUSTMENT / TEST
1. ADJUSTMENT OF OIL PRESSURE INDICATOR  501
501 888, 948 - 9999 -
Pre-MOD. 182
A. Tools and consumable materials  501 
B. Procedure  501 
INDEPENDENT INSTRUMENTS 31-20-00 (BA) 1 1 - 9999
DESCRIPTION AND OPERATION  1 
1. GENERAL  1 
2. LOCATION  1 
3. DESCRIPTION  1 
A. M50 mechanical stop watch or electric stop watch  1 
B. M50 clock  1 
C. M51 hourmeter  1 
CENTRAL WARNING SYSTEMS 31-50-00 (EA) 1 1 - 9999
DESCRIPTION AND OPERATION  1 
1. GENERAL  1 
2. LOCATION  1 
3. DESCRIPTION  1 
A. Advisory panel  1 
B. Aural warnings  1 
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 31 指示/记录系统 TB20飞机维护手册(2)
 

------分隔线----------------------------