曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
27) Fill the oil tank - refer to 12-12-01. 28) Charge the vapor cycle cooling system (if installed) - refer to 12-15-01. 29) Connect the battery - refer to 24-30-02. 30) Make sure all the tools and materials are removed and the work area is clean and free from debris. 31) If removed, install the muffler - refer to 78-20-00. 32) If the aircraft is equipped with disconnect plugs, disconnect "Ground magneto for servicing" plug P133 (42) and connect "Magneto disconnect" plug P132 (43). 33) Install the engine cowlings - refer to 71-10-01. 34) Remove the wheel chocks. 35) Perform a test run-up - refer to 05-30-02. 36) Remove the engine cowlings to check for leaks (oil and fuel). 37) Install the engine cowlings - refer to 71-10-01. 38) Perform a test flight - refer to 05-30-00. Power plant - Removal / Installation Figure 401 ABM Validity : S / N 1 - 9999 71-00 00Page 407 (EA) JUN 02 21 - Breather hose 22 - Clamp 23 - Hose 24 - Clamp 25 - Union 26 - Vacuum pump 27 - Union 28 - Mechanical tachometer control Power plant - Removal / Installation Figure 402 ABAA Validity : S / N 1 - 9999 71-00-00Page 408 (EA) JUN 02 31 - Demisting box (if installed) 32 - Cabin air mixer 33 - Fuel hose 34 - Tie-wrap 35 - Engine pump air vent hose 36 - Breather 37 - Electric pump 38 - LP hose 39 - HP hose 41 - Propeller governor control
61 - Engine mount |