返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 30 防冰和排雨 TB20飞机维护手册(2)

时间:2011-11-02 15:47来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
ADAA
Validity : S / N 1 - 9999 30 TC(EA) Page 1 JUN 04
 
SOCATA
TB 20 MODEL  MAINTENANCE MANUAL
SUBJECT CHAPTER PAGE VALIDITY
AIRSPEED INDICATING SYSTEM 30-30-00 (BA) 1 Option or Standard
DESCRIPTION AND OPERATION  1 Post-MOD. 151
1. GENERAL  1 
2. LOCATION  1 
3. DESCRIPTION  1 
A. Pitot tube  1 
B. Indicator light  1 
C. Switch  1 
AIRSPEED INDICATING SYSTEM 30-30-00 (BA) 501 Option or Standard
ADJUSTMENT / TEST  501 Post-MOD. 151
1. OPERATIONAL TEST OF PITOT TUBE HEATING  501 
A. Tools and consumable materials  501 
B. Procedure  501 
I PROPELLER DEICING 30-60-00 (BA) 1 With propeller deicing
 DESCRIPTION AND OPERATION  1 - TKS system
1. GENERAL  1 
2. LOCATION  1 
3. DESCRIPTION  1 
A. Tank  1 
B. Pump  1 
C. Propeller special rear flange  1 
D. Ring and propeller nozzles  1 
E. Tube and hose  2 
F. Control panel  2 
4. OPERATION  2 
PROPELLER DEICING 30-60-00 (CA) 1 With ice protection
DESCRIPTION AND OPERATION  1 TKS system
1. GENERAL  1 
2. LOCATION  1 
3. DESCRIPTION  1 
A. Propeller special rear flange  1 
B. Ring and propeller nozzles  1 
C. Tube and hose  1 
4. OPERATION  2 
PROPELLER DEICING 30-60-00 (BA) 301 With propeller deicing
SERVICING  301 - TKS system
1. DEICING FLUID  301 
A. Operating instructions  301 

ADM
Validity : S / N 1 - 9999 30 TC (EA) Page 2 JUN 04
 
SOCATA
TB 20 MODEL  MAINTENANCE MANUAL
SUBJECT CHAPTER PAGE VALIDITY
PROPELLER DEICING 30-60-00 (BA) 601 OPTION
INSPECTION / CHECK  601 
1. CHECK OF PROPELLER DEICING SYSTEM  601 
A. Tools and consumable materials  601 
B. Procedure  601 
PROPELLER DEICING 30-60-00 (BA) 801 Two-blade propeller
REPAIR  801 
1. INSTALLATION OF DEICING RUBBER STRIP  801 
A. Tools and consumable materials  801 
B. Procedure  801 
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 30 防冰和排雨 TB20飞机维护手册(2)
 

------分隔线----------------------------