返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 57 机翼 TB20飞机维护手册(8)

时间:2011-11-11 10:03来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
10) Position the central attachment spacers against the tunnel front face.
11) Measure the gap between spacers (4) and the tunnel rear face.
12) Install suitable shims (3) - refer to Table, Figure 401 (2/2).
13) Install washers (1) and bolts (2).
Post-MOD. 167
14) Measure the dimension between the tunnel and bolt (2).
15) Install thrust washer (7) according to the recommended assembly - refer to Table, Figure 401 (2/2).
S / N 1 - 9999
16) Install washers (5) and new locknuts (6). Torque - refer to 20-00-01.
17) Measure the gaps on front fittings (frame C1).
18) Install suitable shims (10) - refer to Table, Figure 401 (2/2).
19) Install bolts (11), washers (9) and new locknuts (8). Torque - refer to 20-00-01.
ADAA
Validity : S / N 1 - 9999 57 00-00Page 403
(EA) JUN 02
 
20) Install bolts (12), washers (13) and new locknuts (14). Torque - refer to 20-00-01.
21) Remove the two padded supports under the wings and the hoisting device.
22) Connect the flap control rods to the main bellcrank - refer to 27-50-00, install new cotter pins.
23) Remove the blanking plugs. Connect the main landing gear actuator hoses - refer to 20-00-02.
24) Replenish the landing gear hydraulic system - refer to 12-13-03.
25) Connect the wing electrical circuits at wing / fuselage junction.
26) Connect the dynamic system and install the three-way union of the static system.
27) Remove the blanking plugs. Connect the high and low pressure hoses of the air conditioning system, if installed - refer to 20-00-02.
28) If installed, replenish the air conditioning system - refer to 12-15-01.
29) Connect the aileron control rods to the lever. Install new cotter pins.
30) Remove the blanking plugs. Connect the fuel system at wing / fuselage junction - refer to 20-00-02.
31) Remove the blanking plugs. Connect the brake system at wing / fuselage junction — refer to 20-00-02.
32) Replenish then bleed the brake hydraulic system - refer to 12-13-01.
33) Replenish the fuel tanks - refer to 12-11-01, and check the fuel supply for correct operation - refer to 28-20-01.
34) Check hydraulic unions and fuel unions for leaks.
35) Mark with a red paint line the hydraulic unions, the fuel unions and the bolts and nuts securing the wings to the fuselage.
36) Inspect the anti-skid coating for condition, replace if necessary - refer to Page 301.
37) Install front and rear bulkheads of the wheel housings.
Pre-MOD. 151
38) Make sure all the tools and materials are removed and the work area is clean and free from debris.
39) Check the landing gears for correct operation (Normal - Emergency) - refer to 32-30-00.
40) Check the roll control linkage for correct operation - refer to 27-10-00.
41) Install the front junction fairings and the cowlings under hull.
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 57 机翼 TB20飞机维护手册(8)
 
------分隔线----------------------------