返回首页
当前位置: 主页 > 通航资料 > 钻石 >

钻石40系列飞机维护手册 DA 40 SERIES AIRPLANE MAINTENANCE MANUAL 3(6)

时间:2011-10-28 13:42来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  

sediment (drain until no water comes out) / visual inspection
d) Openings on lower surface ..............  check for foreign objects and for traces of fuel (if tank is full, fuel may spill over through the tank vent)
CONTINUED
Doc. No. 7.01.05-E  Rev. 5  15-Nov-2007  Page 4A - 13 


e) Stall warn device...................... visual inspection

f) Tank filler ........................... visual inspection, check closed

g) Pitot probe........................... clean, orifices clear, cover

removed, no deformation
h) Wing tip ............................. visual inspection

i) Static dischargers ..................... visual inspection

j) Position light, strobe light (ACL) .......... visual inspection

k) Tie-down ............................ check, clear

l) Aileron and linkage .................... visual inspection

m) Aileron hinges and safety pin ............ visual inspection

n) Foreign objects in aileron paddle ......... visual inspection

o) Flap and linkage ...................... visual inspection

p) Flap hinges and safety pin .............. visual inspection

q) Nacelle underside fuel cooler air in- & outlet . check clear
r) Step................................ visual inspection

4. Fuselage, left side, underside:
a) Canopy, left side ...................... visual inspection

b) Rear cabin door & window .............. visual inspection

c) Fuselage skin ........................ visual inspection

d) Antennas............................ visual inspection

e) Fuselage ............................ check for contamination

(hydraulic fluid) % f) Autopilot static source (if installed) ........ check for blockage
CONTINUED
Page 4A - 14  Rev. 5  15-Nov-2007  Doc. No. 7.01.05-E 


5. Empennage:
a) Stabilizers and control surfaces,
elevator tips ......................... visual inspection
b) Hinges ............................. visual inspection
c) Elevator trim tab ...................... visual inspection, check safetying
d) Rudder trim tab....................... visual inspection, check safetying
e) Tie-down............................ check, clear
f) Tail skid and lower fin .................. visual inspection
g) Static dischargers ..................... visual inspection

6. Fuselage, right side:
a) Fuselage skin ........................ visual inspection
b) Rear window......................... visual inspection
c) Canopy, right side..................... visual inspection
% d) Autopilot static source (if installed) ........ check for blockage

7. Right Main Landing Gear:
a) Landing gear strut and lock ............. visual inspection, sufficient height (typical visible length of bare piston: at least 4 cm/1.6")
b) Down and Uplock switches (3x) .......... visual inspection
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:钻石40系列飞机维护手册 DA 40 SERIES AIRPLANE MAINTENANCE MANUAL 3(6)
 

------分隔线----------------------------