曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
7) Inspect pressure indicator (3) for : - attachment, - blockage of the air vent fitting. 8) Inspect vacuum pump (14) for : - tightening and marking of nuts (13) securing the pump to the rear table, - oil seepage from the drive shaft, - tightening of unions (12) and (15) on the pump body. MM Validity : OPT or STD Post-MOD. 151 37-11-00Page 601 (BA) SEP 04 AIRBORNE installation 9) Inspect hose (11) for : - clamp tightening, - cracking, pinching or fretting wear. SIGMATEK, CHAMPION or AERO ACCESSORIES installation 9) Inspect hoses (11) and (21) for : - clamp tightening, - cracking, pinching or fretting wear. 10) Inspect hose (23) for : - clamp tightening, - cracking, pinching or fretting wear, - routing and attachment, - blockage of the hose at its end. 11) Inspect filter (22) for : - general condition, - tightening of clamps (24) and (25), - condition of the protections on clamp (24) and on the engine mount. All 12) Make sure all the tools and materials are removed and the work area is clean and free from debris. 13) Install engine cowling 121 - refer to 71-10-01. 14) Lock the L.H. instrument panel and, if tilted, the R.H. instrument panel. 15) Test the normal distribution system - refer to Page 501. 16) Install inspection door 211 L and, if removed, inspection door 211 R - refer to 06-30-00. AAAA Validity : OPT or STD Post-MOD. 151 37-11-00Page 602 (BA) SEP 04 Normal distribution - Inspection / Check Figure 601 AAAA Validity : OPT or STD Post-MOD. 151 37-11-00Page 603 (BA) SEP 04
11 - Hose |