返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 80 起动 TB20飞机维护手册(6)

时间:2011-11-15 10:26来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
11 - Ring
12 - Washer
13 - Bolt
14 - Drive shaft
15 - Alternator link rod
16 - Driving gear
17 - Drive
18 - Starter
19 - Alternator wiring
20 - Tie-wrap
Starter - Removal / Installation
Key to Figure 401
I ABAA
Validity : "PRESTOLITE" starter "ELECTROSYSTEMS MHB - 4016" starter 80-00-01Page 404
(CA) SEP 04
 
 
I ABAA
Validity : "PRESTOLITE" starter "ELECTROSYSTEMS MHB - 4016" starter 80-00-01Page 405
(CA) SEP 04
 
 
18 - Starter
19 - Alternator wiring
20 - Tie-wrap
30 - Engine
31 - Alternator

®
 
Starter - Removal / Installation
Figure 402
ABAA
Validity : "PRESTOLITE" starter "ELECTROSYSTEMS MHB - 4016" starter 80-00-01Page 406
(CA) SEP 04
 
STARTER
REMOVAL / INSTALLATION
CAUTION : WHEN REPLACING "ELECTROSYSTEMS MHB - 6016" STARTER WITH A "LYCOMING" OR "PRESTOLITE" OR "ELECTROSYSTEMS MHB - 4016" STARTER, UPDATE WEIGHING REPORT.
1. REMOVAL OF STARTER (Figures 401 and 402)
A. Tools and consumable materials
None
B. Procedure
WARNING : PRIOR TO ANY OPERATION, ENSURE THAT THE ENGINE, EXHAUST PIPE AND MANIFOLDS ARE COLD. IF NOT, TAKE NECESSARY PRECAUTIONS TO AVOID SEVERE BURNS.
WARNING : PRIOR TO ANY OPERATION, ENSURE THAT THE KEY IS REMOVED FROM MAGNETO SELECTOR AND THAT "MAIN SWITCH" IS OFF.
IF AIRCRAFT IS EQUIPPED WITH DISCONNECT PLUG ON FIREWALL, DISCONNECT "MAGNETO DISCONNECT" PLUG AND CONNECT IT TO "GROUND MAGNETO FOR SERVICING" PLUG.
1) Remove the engine cowlings - refer to 71-10-01.
With vapor cycle cooling
2) Remove L40 compressor - refer to 21-55-01.
All
3) Cut off and discard tie-wrap (19).
4) Disconnect power supply cable (1), retain nut (3) and discard lockwasher (2).
5) Cut off and discard the lockwire, remove bolt (12) and washer (11).
6) Remove bolt (8), washer (6) and lockwasher (7). Discard lockwasher (7).
7) Hold starter (17), remove nuts (9), washers (6) and lockwashers (7). Discard lockwashers (7).
8) Remove starter (17).
2. INSTALLATION OF STARTER (Figures 401 and 402)
A. Tools and consumable materials
- Stainless steel lockwire, dia. 0.032 in (0.8 mm)
- Tie-wrap
- Torque wrench 0 - 265 Ibf.in (0 - 30 N.m)
 
B. Procedure
WARNING : PRIOR TO ANY OPERATION, ENSURE THAT THE ENGINE, EXHAUST PIPE AND MANIFOLDS ARE COLD. IF NOT, TAKE NECESSARY PRECAUTIONS TO AVOID SEVERE BURNS.
WARNING : PRIOR TO ANY OPERATION, ENSURE THAT THE KEY IS REMOVED FROM MAGNETO SELECTOR AND THAT "MAIN SWITCH" IS OFF.
IF AIRCRAFT IS EQUIPPED WITH DISCONNECT PLUG ON FIREWALL, DISCONNECT "MAGNETO DISCONNECT" PLUG AND CONNECT IT TO "GROUND MAGNETO FOR SERVICING" PLUG.
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 80 起动 TB20飞机维护手册(6)
 

------分隔线----------------------------