返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 55 安定面 TB20飞机维护手册(7)

时间:2011-11-11 09:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
               
               
               
               
               
       
      
      
      
      
               
               
               
             Comparateur
Dial gage  
 Serre-joints Clamps            
             
             
             
               
               
               
               
 
 
 
Axe d'articulation
Hinge axis
J = 0,8 mm J= 0.032 in
 

 
Elevator - Check of the slack value of the hinge ball joints
Figure 601
AAAA
Validity : S / N 1 - 9999 55-20-01Page 602
(BA) SEP 04
 
ELEVATOR TAB
REMOVAL / INSTALLATION
NOTE : This procedure is applicable to L.H. and R.H. installations. Information specific to R.H. installation are given in square brackets.
1. REMOVAL OF THE ELEVATOR TAB (Figure 401)
A. Tools and consumable materials
- Padded supports
B. Procedure
1) Move the elevator to nose-up position.
2) Remove and discard cotter pin (17).
3) Remove nut (16), bolt (6), spacer (8), washers (4) and (5) and clear tab rod (10) from levers (12).
4) Remove nut (15), washer (14), bolt (7) and spacer (11). Discard nut (15).
5) Hold tab (13) [9] and remove screws (2) and washers (1).
NOTE : Disengage the bonding strap, if installed.
6) Disengage tab (13) [9] and place it on two padded supports.
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 55 安定面 TB20飞机维护手册(7)
 

------分隔线----------------------------