返回首页
当前位置: 主页 > 通航资料 > TB >

TB20 MAINTENANCE MANUAL 55 安定面 TB20飞机维护手册(6)

时间:2011-11-11 09:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
18) Check the elevator travel - refer to 27-30-00.
19) Check the elevator tab travel - refer to 27-30-03.
20) Perform a test flight - refer to 05-30-00.
WA
Validity : S / N 1 - 9999 55-20-01Page 403
(BA) SEP 04
 
1 - Support assembly
2 - Nut
3 - Washer
4 - Balancing weight
5 - Bolt
6 - Bolt
7 - Washer
8 - Cotter pin
9 - Nut
10 - Recessed washer
11 - Hinge fitting
12 - Bolt
 
13 - Hinge fitting
14 - Bolt
15 - Lever
16 - Washer
17 - Nut
18 - Cotter pin
19 - Input rod
20 - Cotter pin
21 - Support assembly
22 - Nut
23 - Washer
24 - Lever
25 - Bolt
26 - Tab rod
27 - Spacer
 

 
Elevator - Removal / Installation
Figure 401
 
WA
Validity : S / N 1 - 9999 55-20-01Page 404
(BA) SEP 04
 
ELEVATOR
INSPECTION / CHECK
1. CHECK OF THE HINGE BALL JOINTS (Figure 601)
A. Tools and consumable materials
- Ruler 5.9 ft (180 cm)
- Clamps
- Dial gage
B. Procedure
1) Remove tail cone 222 - refer to 53-20-04.
2) Use two clamps to attach a ruler to the rear face of frame C9.
3) Attach a dial gage to the ruler end. The gage feeler must rest on the stabilizer lower surface between two elevator tip attachment rivets.
4) Lock the control wheel in neutral position.
5) Apply a load on the horizontal stabilizer end (side opposite to dial gage) and note the dial gage pointer deflections.
6) Ball joints must be replaced when max. slack equals 0.032 in. (0.8 mm).
7) Remove the dial gage, the clamps and the ruler.
8) Make sure all the tools and materials are removed and the work area is clean and free from debris.
9) Install tail cone 222 - refer to 53-20-04.
 

          Regle Ruler   
             Ligne de rivetage 
               0
0
it
               
               
               
               
               
               
               
 
中国通航网 www.ga.cn
通航翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 55 安定面 TB20飞机维护手册(6)
 

------分隔线----------------------------